| Labor charge |
Previous Rate |
Approved Rate |
| Regular Time/hour - 1/2 hour minimum |
| Electric |
$55.00 / hour |
$55.00 / hour |
| Water/Sewer |
$45.00 / hour |
$45.00 / hour |
| Overtime/hour - 1 hour minimum |
| Electric |
$80.00 / hour |
$80.00 / hour |
| Water/Sewer |
$65.00 / hour |
$65.00 / hour |
| |
| Trip to premises for collection or disconnection/reconnection: |
| Note: Only one trip charge per account per incident) |
| Regular time |
$55.00 |
$55.00 |
| Overtime |
$80.00 |
$80.00 |
| |
| Customer Service Charge: |
|
To set up and establish electric and/or water service (one charge any number of meters, electric and water per account established)
|
| Physical meter disconnection/reconnection: |
| Regular time |
$30.00 |
$30.00 |
| Overtime |
$80.00 |
$80.00 |
| Read only (no physical meter disconnection/reconnection): |
| Regular time |
$15.00 |
$15.00 |
| Overtime |
$80.00 |
$80.00 |
| *Note: $30.00 regular time or $80.00 overtime charge applies for a single or multiple meter disconnection/reconnection / account. |
| |
| Charges for damaged street light poles: |
Damaged beyond repair (Street light poles are no longer replaced with wood poles.) |
Replacement cost of steel or fiberglass pole plus installation costs (labor and materials) |
| Repairable |
Actual repair labor and materials |
| |
| Equipment: |
| Line trucks |
$75.00 / hour |
$75.00 / hour |
| Basket trucks |
$50.00 / hour |
$50.00 / hour |
| Ditch witch trencher |
$30.00 / hour |
$30.00 / hour |
| Dump truck |
$25.00 / hour |
$25.00 / hour |
| Bobcat loader |
$25.00 / hour |
$25.00 / hour |
| Chipper |
$15.00 / hour |
$15.00 / hour |
| Water backhoe |
$30.00 / hour |
$30.00 / hour |
| Air compressor |
$10.00 / hour |
$10.00 / hour |
| Onan 300 KW generator |
$40.00 / hour |
$40.00 / hour |
| Underground cable fault thumper |
$10.00 / hour |
$10.00 / hour |
| Sewer flush truck |
$75.00 / hour |
$75.00 / hour |
| Sewer TV truck |
$50.00 / hour |
$50.00 / hour |
| IHC tractor mower |
$25.00 / hour |
$25.00 / hour |
| Wire pulling & tension machine |
$25.00 / hour |
$25.00 / hour |
| Mini Excavator |
$25.00 / hour |
$25.00 / hour |
| |
| Pickups, vans, cars - included in labor charges as transportation |
| |
| Interdepartmental - per hour actual operating costs with insurance and depreciation |
| |
| Electric Service: |
| New service with tap |
$55.00 |
$55.00 |
| New temporary service |
$55.00 |
$55.00 |
| Temporary to permanent service: |
| For services using standard metering |
$55.00 |
$55.00 |
| For services using CT metering |
$80.00 |
$80.00 |
| |
| Water service from main: |
| 1" water service calculated to center of street |
$700.00 |
$700.00 |
| Add for line setter 5/8" |
$75.00 |
$75.00 |
| Add for line setter 3/4" |
$100.00 |
$100.00 |
| Add for line setter 1" |
$150.00 |
$150.00 |
| Add for tile setting |
$185.00 |
$185.00 |
| Add for concrete removal and replacement |
$5.00 / sq. ft. |
$5.00 / sq. ft. |
| Over 1" water service |
Actual time and material |
| |
| Material from stores: |
| Interdepartmental - book cost plus 10% for storage |
| Interest and handling |
| Other - 25% |
| |
| Water mains: |
| When necessary for Water Department to perform customer notification or valve operation |
No Charge |
No Charge |
| In lieu of assessment, residential and commercial |
Most recent 10 district average for 8" |
| |
| Testing and chlorinating: |
| To contractors of new main installations / running foot |
$0.75 |
$0.75 |
| |
| Sewer mains: |
| In lieu of assessment, residential and commercial |
Most recent 10 district average |
| |
| Televising & Inspection of Sewer |
$1.25 / foot |
$1.25 / foot |
| |
| Sewer tap charge: |
| 4" |
$200.00 |
$200.00 |
| 6" |
$250.00 |
$250.00 |
| Tap charge outside corp. limits |
tripled |
tripled |
| |
| Return check charge |
$25.00 |
$25.00 |
| |
| Late Payment charge |
1.33% |
1.33% |
| |
| Temporary water service from fire hydrant: |
| Deposit generally required on meter/backflow device |
| Customer is responsible for any damages which may occur to this device |
$1,000.00 Deposit |
$1,000.00 Deposit |
| |
| Water department installs & removes (required - 1/2 hr. each) |
$21.00 |
$21.00 |
| Daily rental for meter/backflow device |
$1.00 |
$1.00 |
| All consumption on meter charged at current rates |
| |
| Temporary water service up to and including 1" hose connection: |
|
Meter/backflow device required at all new construction sites and any site
which the Water Department may consider to be potentially hazardous.
|
| |
|
Meter/backflow device installed by Water Department (no charge), with no deposit required.
|
| |
|
Customer is responsible for any damages which may occur to this device.
Monthly charge is (5 units x current water rate) plus consumption at current rates.
|
| |
| Water sales at 7th and Chestnut Plant: |
|
Water is available at the Water Plant 24 hours per day, 7 days per week.
The overhead and side fill water device requires the use of quarters or tokens,
which can be purchased either at the ML&W office at 3rd and Vine or the Water Plant at 7th & Chestnut.
Office hours are 8-5, M-F. Water Plant hours are 7:30-4:00 M-F.
Each token or quarter is good for the purchase of 150 gallons of water.
|
| |
| Charges for frozen broken water meters: |
| Damaged beyond repair |
Actual meter replacement cost ** |
| Repairable |
Actual labor charge rate plus material |
|
** Will be charged a fee for meter removal and replacement in addition to stated charges
|
| |
| Sewer dump charges Wastewater Plant: |
| Septage: |
| Septage Dumping Charge (effective 10/1/08) |
$0.06 / gallon (as metered) |
$0.06 / gallon (as metered) |
| |
| Mud and Grease: |
| Small truck up to 700 gallon |
$25.00 |
$25.00 |
| Large truck 700 to 1500 gallon |
$50.00 |
$50.00 |
| Larger than 1,500 gallons |
$100.00 |
$100.00 |
| |
| Deposits: |
| Residential electric: |
$50.00 minimum |
$50.00 minimum |
| Residential water: |
| Tenant |
None |
None |
| Owner |
None |
None |
| Commercial electric and water: |
|
Cash or surety bond of 3 times estimated monthly bill.
|
| * A deposit may be waived with proven good credit or an acceptable cosigner. |
| |
| Interest paid on deposits returned: |
0.30% |
0.20% |
| |
| Testing of electric or water meter for customer: |
| If not tested within last 5 years |
No Charge |
No Charge |
| If tested within last 5 years |
$55.00 |
$55.00 |
| |
| Locating of underground electric, water and sewer facilities which are the responsibility of the City |
No Charge |
No Charge |
| Note: All locates must go through Digger's Hotline. Only emergency locates will be performed after hours. |
| |
| Subdivision Developments: |
|
Effective October 1, 2005,
subdivision developers are required to provide and install all conduits for primary,
secondary and street lighting as well as fiberglass transformer/switchgear
pads in compliance with the City of North Platte Electric Department
specifications. These specifications are available at the Municipal
Light and Power Engineering Department Office located at 201 West 3rd; North
Platte, Nebraska.
|